A MAJOR CHALLENGE

From a technical point of view, this project presented a major challenge in terms of space: all the electrical control equipment had to be integrated into a cramped mechanical room in the basement, beneath the fountain.

Elkon achieved this thanks to its unique, space-saving CCM design. The company custom-built two smart CCMs (CCMi) to power and control the lighting displays, water jet pumps, and glycol pumps (for the heating system in the paving stones around the fountain).

In total, there are 37 compartments that hold all the necessary equipment.